Quick answer
Have the accepted proposal, the model numbers and a simple floor plan available when the crew arrives. The most useful time to discuss a wall unit, drain exit or outdoor location is while someone can still point to an alternative. If you will be away, agree on who can approve a change and how the crew should reach them.
Your mini-split AC installation timeline
| When | What the homeowner can check |
|---|---|
| Before arrival | Clear access to the proposed equipment locations. Keep the signed bid and room sketch nearby. Ask when power may be interrupted so you can plan around it. |
| Before the first opening | Walk both sides of the wall with the installer. Confirm the head location, the outdoor mounting point and where the drain will discharge. |
| While the crew is on site | If the route changes, get the revised scope and price in writing before authorizing extra work. Check the line-set allowance in your bid. |
| Before final sign-off | Try the controls, ask for the startup record and agree on who will return for any deferred checks. |
Wall bracket, ground stand or pad?
Ask the installer to mark the proposed outdoor location on your sketch. For a wall bracket, identify the room on the other side and ask how the installer will limit vibration. For a stand or pad, point out where snow collects and where meltwater goes. Have the installer confirm clearance and service access against the outdoor model’s instructions. Record which mount, base preparation and drainage work the price includes.
Walk the route together
Start at the indoor unit. Stand where the bed, sofa or workbench will be and ask the crew to indicate the unit’s position. Check whether it conflicts with a planned cabinet or curtain rail. Then walk outside and have the installer point out the outdoor unit, the visible line cover, the drain discharge and the space they will need for future service. Compare that route with the one in your proposal.
What if the planned route changes?
Suppose the agreed route runs down a side wall, but the installer finds the drain needs a different path. Photograph the proposed exit. Ask whether the change affects drainage, finish repairs, access, cost or the completion date. Record the answer while both parties can see the location.
“The proposed drain exit moves from the side wall to the driveway wall. Please mark the new route on the sketch and confirm the price change, who restores the finish, and whether any follow-up visit is needed.”
Ask for a demonstration before handover
Use the remote yourself while the installer is there. Select the intended mode, change the setpoint and identify the sensor that controls the room. Ask the installer to demonstrate filter access and point out the relevant instructions in the model’s manual. For multiple heads, ask how the controls behave when occupants request different modes.
Commissioning is the installer’s verification that the system operates as intended. Ask which checks were completed, which results they recorded, and whether weather or unfinished work prevented any check. For a deferred check, write down who will return and when. The US Department of Energy provides a ductless heat-pump system checklist.
Keep a handover record you can find next winter
- Indoor and outdoor model and serial numbers, with a photo of each accessible label.
- Accepted proposal, signed changes, final invoice and any applicable inspection paperwork.
- Startup record, manuals, warranty terms and the contact for installation issues.
- Any unfinished item, its owner and the agreed follow-up date.
During the first week, record the room, time, mode, setpoint and what you observed if comfort differs from expectations. “Bedroom warm at 10 pm with door closed” is easier to investigate than “system feels weak.” Use the comfort and service log to retain those observations.